19 research outputs found

    Selective maintenance optimisation for series-parallel systems alternating missions and scheduled breaks with stochastic durations

    Get PDF
    This paper deals with the selective maintenance problem for a multi-component system performing consecutive missions separated by scheduled breaks. To increase the probability of successfully completing its next mission, the system components are maintained during the break. A list of potential imperfect maintenance actions on each component, ranging from minimal repair to replacement is available. The general hybrid hazard rate approach is used to model the reliability improvement of the system components. Durations of the maintenance actions, the mission and the breaks are stochastic with known probability distributions. The resulting optimisation problem is modelled as a non-linear stochastic programme. Its objective is to determine a cost-optimal subset of maintenance actions to be performed on the components given the limited stochastic duration of the break and the minimum system reliability level required to complete the next mission. The fundamental concepts and relevant parameters of this decision-making problem are developed and discussed. Numerical experiments are provided to demonstrate the added value of solving this selective maintenance problem as a stochastic optimisation programme

    Optimizing the integrated economic production quantity for a stochastically deteriorating production system under condition-based maintenance

    Get PDF
    This paper proposes a new integrated economic production quantity (EPQ) and condition-based maintenance (CBM) model for a stochastically deteriorating production system. Inspections are performed periodically to measure the real time degradation. The system fails (out-of-control) whenever its degradation is beyond a critical threshold level. In the out-of-control state, a proportion of nonconforming items are produced. To assess the degradation of the system and to increase the production of conforming items, preventive maintenance (PM) actions are carried out. An integrated EPQ and CBM optimization model that minimizes the total expected cost rate over an infinite time horizon is developed. The objective is to determine a joint optimal EPQ and PM strategy minimizing the sum of inspection/maintenance and setup costs, cost of nonconforming items in addition to inventory holding cost. Numerical experiments are provided to illustrate the proposed approach

    Integrated production quality and condition-based maintenance optimisation for a stochastically deteriorating manufacturing system

    Get PDF
    This paper investigates the problem of optimally integrating production quality and condition-based maintenance in a stochastically deteriorating single- product, single-machine production system. Inspections are periodically performed on the system to assess its actual degradation status. The system is considered to be in ‘fail mode’ whenever its degradation level exceeds a predetermined threshold. The proportion of non-conforming items, those that are produced during the time interval where the degradation is beyond the specification threshold, are replaced either via overtime production or spot market purchases. To optimise preventive maintenance costs and at the same time reduce production of non-conforming items, the degradation of the system must be optimally monitored so that preventive maintenance is carried out at appropriate time intervals. In this paper, an integrated optimisation model is developed to determine the optimal inspection cycle and the degradation threshold level, beyond which preventive maintenance should be carried out, while minimising the sum of inspection and maintenance costs, in addition to the production of non-conforming items and inventory costs. An expression for the total expected cost rate over an infinite time horizon is developed and solution method for the resulting model is discussed. Numerical experiments are provided to illustrate the proposed approach

    Manufacturing strategy using new and reconditioned rotable spare parts

    Get PDF
    Part of: Seliger, Günther (Ed.): Innovative solutions : proceedings / 11th Global Conference on Sustainable Manufacturing, Berlin, Germany, 23rd - 25th September, 2013. - Berlin: Universitätsverlag der TU Berlin, 2013. - ISBN 978-3-7983-2609-5 (online). - http://nbn-resolving.de/urn:nbn:de:kobv:83-opus4-40276. - pp. 224–229.The process of remanufacturing is attractive economically and environmentally for both manufacturers and consumers. It is important to properly use reconditioned parts in a production plan based on their availability and production costs. A mathematical model is derived to find the cost-optimal production strategy that incorporates reconditioned components in the manufacturing effort. New and reconditioned parts are used to carry out replacements upon failure under an unlimited free replacement warranty policy. Key production decisions, such as when remanufacturing should commence, how long the warranty period should be, and how many returned parts should be reconditioned are answered. The availability of reconditioned parts and their discounted costs are incorporated in the model. Interactions between these decisions and their impacts on the manufacturing system and the consumer are investigated. A case study on aircraft rotable spare parts will be presented

    BMC Public Health

    Get PDF
    BACKGROUND: The extent of SARS-CoV-2 circulation in African countries is still unclear. Seroprevalence studies are a common approach to epidemiological surveillance, allowing estimation of the proportion of people who have had contact with the virus. We aimed at estimating the seroprevalence of anti-SARS-CoV-2 antibodies and associated factors in Togo at the national level in 2021 according to age groups, gender, and place of residence (rural or urban). METHODS: From 15 May to 31 June 2021, we conducted a nationally representative cross-sectional serological survey in 12 health districts (two districts per health region) in the > 5 years old population in Togo. The Wantai SARS-CoV-2 total antibody assay S protein receptor-binding domain-based ELISA (Wantai Biological Pharmacy Enterprise Co.; Beijing, China) was used to determine the presence of SARS-CoV-2 total antibodies in plasma. Crude and weighted seroprevalences (weighted by age, sex and place of residence) were calculated and then weighted seroprevalences were adjusted according to sensitivity and specificity of the ELISA test. Finally, logistic regression models were performed in order to describe factors associated. RESULTS: Of the 7593 participants, the overall weighted and adjusted seroprevalence of total anti-SARS-CoV-2 antibodies was 65.5% (CI95%: 18.9-21.1). Urban dwellers, young adults (30-49 years) and vaccinated individuals were significantly more likely to be seropositive. CONCLUSION: The high seroprevalence we observed is consistent with observations across West Africa. Quantification of the level of immunity in the population is needed to know how close we are to herd immunity. In the meantime, vaccination against the COVID-19 remains necessary

    BMC Public Health

    Get PDF
    The original publication [1] of this paper contained a typo in the abstract. The value "CI95%: 18.9–21.1" should have been "95%CI: 64.3–66.6". This was correct elsewhere in the article. The original article has been updated to correct this

    Développement d'un modèle d'identification et de gestion des pièces de rechange

    No full text
    corecore